Case Studies
Which application are you interested in?
-
Area
-
Year
-
Products
-
New
Detention Pond under the Shalu Overpass of Freeway No. 3, Taichung, Taiwan
Taiwan | 2015-2019
Products:ACEGrid® GG, ACETex® NW, ACESandbag™ EC, ACEPin™ T , ACEDrain™ S
Application:Flood Detention
Application:Flood Detention
Geosynthetic Detention Basin at Shalu Interchange, Taiwan
Taiwan | 2015-2019
Products:ACEGrid® GG, ACETex® NW, ACESandbag™ EC, ACEPin™ T , ACEDrain™ S, ACELiner™
Application:Flood Detention
Application:Flood Detention
Ecological Landscape Park with Function of Flood Detention, Pinglin Forest Park, Taichung, Taiwan
Taiwan | 2015-2019
Products:ACEMat™ R
Application:Flood Detention
Application:Flood Detention
Community and Environmental Improvement Project in Hsinchu County, Taiwan
Taiwan | 2015-2019
Products:ACESandbag™ EC
Application:Slope Erosion Control ,Flood Detention
Application:Slope Erosion Control ,Flood Detention
Shihmen Farm Pond Rehabilitation Project in Miaoli County, Taiwan
Taiwan | 2015-2019
Products:ACESandbag™ EC
Application:Slope Erosion Control ,Flood Detention
Application:Slope Erosion Control ,Flood Detention
Maple Garden, a Recreational Park with Function of Flood Detention in the City Center, Taichung, Taiwan
Taiwan | 2010-2014
Products:ACEGrid® GG, ACETex® PP, ACETex® NW, ACESandbag™ EC, ACEPin™ T
Application:Slope Stabilization ,Flood Detention
Application:Slope Stabilization ,Flood Detention
The Case of Repurposing Unused Fish Ponds into a Smart Grid Demonstration Park , Pingtung, Taiwan
Taiwan | 2010-2014
Products:ACEGrid® GG
Application:Flood Detention
Application:Flood Detention
Detention Pond with Reinforced Earth Dike for Fazi River, Taichung, Taiwan
Taiwan | 2010-2014
Products:ACEGrid® GG, ACESandbag™ EC, ACEPin™ T
Application:Flood Detention
Application:Flood Detention