Dredge and Land Reclamation, Anping Harbor, Tainan, Taiwan

Products:ACETube® - hydraulic structures

Application: Sediment Dredging, Seawalls and Bulkheads

Background

Anping harbor has been used for 36 years; the original design is now inadequate, so was required to build new facilities. In addition, dredging the harbor was also an urgent issue. The port authority required dredging the silt and using it effectively; otherwise removal of the silt would entail additional cost. To further land reclamation, the relevant dike engineering is anticipated to use the silt as construction material.

Problem / Task

The common structures of dikes are riprap or caisson. Riprap is expensive and less durable. Cast-in-place reinforced concrete caissons are durable but the cost is also high. While dredged silt can be used as filling material for caissons, it cannot be used for riprap structures. Therefore, finding a relatively simple and fast construction method at low cost, and which could take advantage of silt, is the biggest challenge of the case.

Solution/ Design & Construction

The required dike for land reclamation was 168 m long and 10 m wide at the bottom and 2.5 m at the top. Considering in situ varying topographic contours, different sizes of ACETubes® geotextile tubes were designed. For this project, the tube circumference was 8.6 m to 12.8 m and the length was 37 m to 47 m. The total length of ACETube® used was 1,008 m. It was then stacked up for three layers, to 5 m high. The silt could fill the ACETube®, and backfilling the area behind ACETube® dike would provide the reclamation material.

Result

In April, 2015, this dike was completed within one month. Besides the reclamation land, the dike constructed by ACETube® geotextile tubes also used more than 5,200 cubic meters of silt dredged from the deposit area of the Harbor, effectively reducing the cost of silt removal. Comparing ACETube® and caisson, the ACETube® solution provides a relatively easy and faster installation and at a lower cost than using caisson. We can understand that the geotextile tube solution can be a good substitute to some traditional dike methods.

Sediment Dredging

Sediment Dredging

Freshwater and seawater currents carry sediments into harbors and other naval passageways constricting navigation and the flow of water. Dredging the sediment a...

Seawalls and Bulkheads

Seawalls and Bulkheads

Seawalls, as wave-proof structures built along the shoreline, are important hydraulic structures to withstand waves, tides or surges for protection of inhabited...

Related Products

Similar Case Studies

Detention Pond under the  Shalu Overpass of Freeway No. 3, Taichung, Taiwan

Detention Pond under the Shalu Overpass of Freeway No. 3, Taichung, Taiwan

Taiwan | 2015-2019
Products:ACEGrid® GG, ACETex® NW, ACESandbag™ EC, ACEPin™ T , ACEDrain™ S
Application:Flood Detention
Geosynthetic Detention Basin at Shalu Interchange, Taiwan

Geosynthetic Detention Basin at Shalu Interchange, Taiwan

Taiwan | 2015-2019
Products:ACEGrid® GG, ACETex® NW, ACESandbag™ EC, ACEPin™ T , ACEDrain™ S, ACELiner™
Application:Flood Detention
Use Geotextile Tube as Mine Slurry Dewatering Treatment, Indonesia

Use Geotextile Tube as Mine Slurry Dewatering Treatment, Indonesia

Asia | 2015-2019
Products:ACETube® - dewatering system
Application:Sludge Treatment, Tailing Dewatering

GEOACE website uses cookies for best service. If you continue surfing, then you agree with our policy. If you want to know more, please click PRIVACY POLICY

Agree