Background

Hukou Township Office was scheduled to implement an improvement project for the surrounding environment of the 7th Neighborhood in Hunan Community to renovate the long-term abandoned and unmaintained land in response to the plan of rural regeneration. In 2015, the military allocated 15 hectares of land for greening and assisted in improving the drainage system and beautifying the landscape.

Problem / Task

Due to the long-term lack of a complete drainage system and heavy rainfall, it caused rainwater to overflow and eroding the surface of the land. This place was left unattended, and accumulated waste, so the environment was seriously polluted and threatened. In order to resolve the problems, Hukou Township Office introduced soil and water conservation engineering, including the ecological ditch and detention basin. The engineering not merely strengthens the drainage system to decrease the original problems but also sustains the ecosystem and landscape.

Solution/ Design & Construction

To improve the drainage capacity, avert the soil from erosion, and protect the environment, about 30,000 pieces of ACESandbag™ EC were applied in the project. After filling, constructors can install the ACESandbag™ EC in accordance with the design of the drainage ditch and detention pond wall, both of which are conducive to the space condition on the growth for going green. The Detention basin is built with the aim to work on energy dissipation for the drainage flow; the construction adopts a two-layer design and stacks sandbags beside the outer edge of the second layer. The installation method can effectively buffer the flow of water scouring from top to bottom and avoid water flow downwards to damage the bottom of the detention basin.

Result

Using ACESandbag™ EC can not only effectively protect the surface of the ecological ditch from eroded but also retain the filler during river scour; therefore, plants grow steadily, and ecological environment restores well. Because of the excellent durability and UV resistance, ACESandbag™ EC can permanently maintain the drainage and flood detention functions. After heavy rains, the drainage ditches and detention basin still intact and solid. The overall system is in good working order, and vegetation gradually covers its surface, successfully achieving the goals of mitigating erosion and improving the ecological environment.

Slope Stabilization

Slope Stabilization

ACE offers a variety of geosynthetic products and combinations that minimize slope erosion and boost soil stability. Our quick and reliable earth stabilization...

Flood Detention

Flood Detention

Detention basin is usually constructed in the heavy rainfall runoff area to temporarily store surface runoff and reduce the influence of flood on downstream are...

Related Products

Similar Case Studies

Detention Pond under the  Shalu Overpass of Freeway No. 3, Taichung, Taiwan

Detention Pond under the Shalu Overpass of Freeway No. 3, Taichung, Taiwan

Taiwan | 2015-2019
Products:ACEGrid® GG, ACETex® NW, ACESandbag™ EC, ACEPin™ T, ACEDrain™ S
Application:Flood Detention
Geosynthetic Detention Basin at Shalu Interchange, Taiwan

Geosynthetic Detention Basin at Shalu Interchange, Taiwan

Taiwan | 2015-2019
Products:ACEGrid® GG, ACETex® NW, ACESandbag™ EC, ACEPin™ T, ACEDrain™ S, ACELiner™
Application:Flood Detention
Dredge and Land Reclamation, Anping Harbor, Tainan, Taiwan

Dredge and Land Reclamation, Anping Harbor, Tainan, Taiwan

Taiwan | 2015-2019
Products:ACETube® - hydraulic structures
Application:Sediment Dredging, Seawalls and Bulkheads

GEOACE website uses cookies for best service. If you continue surfing, then you agree with our policy. If you want to know more, please click PRIVACY POLICY

Agree