News
ACE Geosynthetics: Top Winner of the 2021 International Achievement Awards!
It is the second Best in Category and the eighth Award of Excellence we received from IFAI in the recent decade.
Due to the special construction of two-stage MSEWs, it requires the geogrid with ultra-durable characteristics with lower creep, the high tensile strength geotextile was demanded as well. This challenge gives us the opportunity to join the project.
ACE Geosynthetics provides economical and safe solutions for customers, and works with customers to develop new application systems that manage to solve difficult engineering problems. Ace your project with ACE team!
New Video
【Video】The Benefit of Using ACETex® ES720 in Road Construction
ACETex® ES geotextile series are available in various tensile strengths and hydraulic properties to enhance the safety, reliability, and serviceability of paved and unpaved roadways and meet diverse project engineering needs. More detailed related to the application, please view the video.
The Benefit of Using ACETex® ES720 in Road Construction
In the project, the construction site is in the intertidal zone. To solve the dredging and sedimentation problem, it requires to backfill the sand into the zone near the shoreline. And the area behind the cofferdam was backfilled with dredged sand for future land use. Therefore, PP high-strength woven geotextile is used. The design height of the cofferdam is 5 m, and the final structure section is stacked with 2+1 ACETube®. For the convenience of construction, the bottom ACETube® is filled at low tide. The water-sand ratio of the filling material will be adjusted during the filling operation, which can help the ACETube® to increase structural integrity. In addition, the special handling loops design customized according to the needs of the case can effectively assist the spreading, positioning, and anchoring of ACETube® in the filling process, or to replace for the lack of on-site construction equipment. The temporary cofferdam would be converted into a revetment core in the future, significantly reducing the construction cost and time. Click here to find out how we can support your cofferdam case.
ACETube® Cofferdam Reclamation Construction
Please refer to the latest uploaded information and files on the official website below, and feel free to contact us for further details.
Product
1. ACENail™ SD
● Type: Erosion and Sediment Control
Brochure
1.ACENail™ SD Product Brochure
To know our construction supports, visit our website.
To be a member, visit the page to apply for an account.
To learn our exclusive designed services for our online members, please click here.
Similar News
Safeguarding for Shallow Slope Sliding: A Sustainable Slope Stabilization Project
TOP STORY Shallow Landslide Treatment Project, Ba Deo Park, Ha Long City, Vietnam Backgrou...
Innovative Flood Management: Detention Pond with Flood Control and Recreational Design
Detention Pond with Reinforced Earth Dike for Fazi River, Taichung, Taiwan Background In recen...
Reinforcement of the Slope at the Entrance Ramp of Interchange on National Freeway, Taiwan
"TOP STORY" In Taiwan, an island nation, freeways play a pivotal role in facilita...